CPM - Critical Path Method reportand presendation
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
project report helper
Active In SP

Posts: 2,270
Joined: Sep 2010
29-10-2010, 02:37 PM

.zip   pert MITTAL.zip (Size: 304.5 KB / Downloads: 41)
.zip   pert MITTAL.zip (Size: 304.5 KB / Downloads: 41) PM - Critical Path Method


In CPM activities are shown as a network of precedence relationships using activity-on-node network construction
Single estimate of activity time
Deterministic activity times

USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.
seminar flower
Super Moderator

Posts: 10,120
Joined: Apr 2012
14-08-2012, 10:05 AM


.pptx   cpm.pptx (Size: 68.65 KB / Downloads: 15)


CPM network are usually used for repetitive type of project and implimentations, where fairly accurate estimate of time can be made for the activities of the project and implimentation.
The activities of these project and implimentations are characteristically subject to relatively small amount of variation.
CPM is found to be of much use in the construction of massive structures like dams, bridges, tunnels, high rise buildings, etc.,
CPM is not suitable for research and development type of project and implimentations.

Activities time

In the network, it is important to know the criticality of the activity, time available to perform the activity provided date of completion of a project and implimentation. In the previous section we have already talked about various method of obtaining activity duration. We shall be interested in the question that
How early we can start the activity.
How much we can delay the activity such that target date of completion of project and implimentation is not affected
What the time available to perform the activity.
To answer the above question we shall associate (define) following time with an activity
a)       Early start time
b)       Early finish time
c)       Latest start time
d)       Latest finish time

Criticality and critical activity

Sub critical activity when FT is +ve needs normal attention.
Critical activity when FT is zero extra attention.
Super critical activity when FT is –ve needs special attention.

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: sample high rise cpm schedule, http seminarprojects com s seminar report on critical path method, critical path method, seminar report on critical path method,
Popular Searches: cpm network, idetification of safety critical equipment, what is critical care powerpoint, seminar files with reportand ppt, program or project evaluation and review technique and critical path method, critical software, guidance for identifying method for safety critical elements,

Quick Reply
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  House's Path-Goal Model study tips 0 267 22-08-2013, 02:11 PM
Last Post: study tips
  The Scope and Method of Economics PPT study tips 0 294 26-06-2013, 03:15 PM
Last Post: study tips
  Developing the Models of Service Quality Gaps: A Critical Discussion pdf study tips 0 369 13-06-2013, 03:59 PM
Last Post: study tips
  Smoothing the path of integration study tips 0 284 11-02-2013, 11:16 AM
Last Post: study tips
  Employer engagement: the critical role of employee commitment project girl 0 334 07-02-2013, 12:27 PM
Last Post: project girl
  VOGEL’S APPROXIMATION METHOD PPT project girl 0 654 30-11-2012, 06:32 PM
Last Post: project girl
  A New Framework for Selection of the Best Performance Appraisal Method seminar tips 0 312 22-10-2012, 04:15 PM
Last Post: seminar tips
Last Post: seminar flower
  Human Capital Development and Critical skill analysis in Banking Sector of India seminar flower 0 310 01-10-2012, 05:10 PM
Last Post: seminar flower
  Project Management - CPM/PERT PPT seminar flower 0 856 20-09-2012, 04:18 PM
Last Post: seminar flower