There are several ways you can optimize your processes to improve profitability. But it can be difficult to understand the overall effectiveness of a complex operation so you can decide where to make improvements. That's especially true when the process involves multiple pieces of equipment that affect each other's effectiveness.In today's economy, you're expected to continuously improve your Return on Total Capital. And as capital to build new, more efficient plants becomes more difficult to obtain, you often have to meet growing production demands with current equipment and facilities - while continuing to cut costs.

One metric that can help you meet this challenge is Overall Equipment Effectiveness, or OEE. OEE measures the health and reliability of a process relative to the desired operating level. It can show you how well you're utilizing resources, including equipment and labor, to satisfy customers by matching product quality and supply requirements.

Overall Equipment Effectiveness (OEE) measures total performance by relating the availability of a process to its productivity and output quality.

OEE addresses all losses caused by the equipment, including
" Not being available when needed because of breakdowns or set-up and adjustment losses
" Not running at the optimum rate because of reduced speed or idling and minor stoppage losses
" Not producing first-pass A1 quality output because of defects and rework or start-up losses.

OEE was first used by Seiichi Nakajima, the founder of total productive maintenance (TPM), in describing a fundamental measure for tracking production performance. He challenged the complacent view of effectiveness by focusing not simply on keeping equipment running smoothly, but on creating a sense of joint responsibility between operators and maintenance workers to extend and optimize overall equipment performance.

First applied in discrete manufacturing, OEE is now used throughout process, batch, and discrete production plants.


The overall performance of a single piece of equipment or even an entire factory will always be governed by the cumulative impact of the three OEE factors:

Availability, Performance Rate and Quality Rate.

OEE is a percentage derived by multiplication of the three ratios for the factors mentioned above. The OEE percentage is used for analysis and benchmarking.

What is OEE?

OEE = Availability X Performance Rate X Quality Rate
OEE is calculated by multiplying three factors: availability, productivity, and quality.

% OEE = ( % Availability ) * ( % Productivity ) * ( % Quality )

The values used can reflect an entire processing plant, a process line, or an individual piece of equipment.

For individual equipment, the performance of the equipment is compared to earlier values for the same equipment or to similar pieces of equipment. Changes in OEE or its elements are tracked and trended over time. OEE for a process line treats the entire line as a single unit, regardless of how much equipment it includes. For multiple-recipe or batch operations, OEE is calculated for each product produced. Like a process line, a process plant performs as a whole, and OEE is therefore calculated for the entire plant as a unit.


Percent of scheduled production (to measure reliability) or calendar hour's 24/7/365 (to measure equipment utilization), that equipment is available for production

Equipment availability isn't just assumed to be the length of the shift in which it is operated. Instead, it's based on actual operating time, as a percentage of the possible production time
Use Search at http://topicideas.net/search.php wisely To Get Information About Project Topic and Seminar ideas with report/source code along pdf and ppt presenaion

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: equipment performance tracker project, seminar projects thread overall equipment effectiveness oee, overall equipment effectiveness ppt, oee for batch plants, overall equipment effectiveness, contact columbiaasia com loc es, overall equipment effectiveness improvement through tpm,
Popular Searches: four willer hidrolic jeck for servicing equipment, pvc pipe making overall unit cost, what are overall trends of e recruitment use and practice, contact columbiaasia com loc es, seminar projects thread overall equipment effectiveness oee, overall equipment effectiveness, instrumentation equipment,

Quick Reply
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Off-Highway equipment seminar tips 0 354 14-01-2013, 03:40 PM
Last Post: seminar tips
Last Post: project girl
  Efficient Sintering Equipment for the Production of Engineering Ceramics ppt seminar flower 0 414 03-09-2012, 12:23 PM
Last Post: seminar flower
  An Introduction to Material Handling Equipment Selection seminar ideas 0 442 11-08-2012, 11:20 AM
Last Post: seminar ideas
  MATERIAL HANDLING EQUIPMENT seminar ideas 1 1,173 04-06-2012, 10:55 AM
Last Post: seminar ideas
  MIAB Welding Equipment seminar ideas 0 527 04-05-2012, 11:28 AM
Last Post: seminar ideas
  Overall Equipment Effectiveness (OEE) summer project pal 0 1,911 08-01-2011, 09:31 AM
Last Post: summer project pal