container terminal management system
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
project report tiger
Active In SP

Posts: 1,062
Joined: Feb 2010
09-02-2010, 08:25 PM

.doc   Container Terminal Management System.doc (Size: 35.5 KB / Downloads: 100)

PROJECT TITLE: Container Terminal Management System (CTMS)
The aim of the project and implimentation is to develop a Container Terminal Management System (CTMS) for a large container port terminal having one of the biggest container handling facilities in the country. The terminal occupies a strategic position and has formed strategic partnerships with major shipping lines to provide customers in the country and around the region, with links to more than 100 ports around the world. The container yard at the terminal covers a total area of 60 hectares and handles both empty and laden containers with ample space reserved for transshipment traffic.
To ensure operational efficiency, CTMS application needs to be developed with the modules as described below:
CTMS modules: There are two major modules in the CTMS system:
1) Containers module
2) In-Yard operations module
Functionality of the modules
Containers module
The Containers modules will have ability to handle the following:
Export Containers
The Voyage call (Vessel arrival) has been registered by the container port terminal through the system with reference by Shipping Agent. The export containers are booked by Shipping Agents through CONTRAK system. Then the shipping agent will assign Hauler to handle the container to the port. The customs clearance will be handled by forwarding agent appointed by shipping agent. After customs documents clearance, the container will enter into the port by hauler. Now, the container will be accepted by the port terminal and stacked in an allocated Yard Location inside KCT Yard. On arrival of Vessel, the container will be loaded into Vessel and necessary bill will be generated by the System.
Import Containers
The Voyage call (Vessel arrival) has been registered by the container terminal through the system with reference by Shipping Agent. The container list, which is going to be imported, is registered by the shipping agents through the system. On arrival of vessel, the containers are discharged from the vessel and stacked in allocated yard location.
Empty Containers
The empty containers also follow the same operation as export, import containers. Apart from that, the empty containers are stacked in yard in a separate location as per the request from shipping or forwarding agent.
Reefer Container Handling
All refrigerated containers (Reefer Containers) are stored in separate location inside the yard as it requires necessary cooling before loading into the ship or delivered to the customer. The customer may also request the port terminal to load cargo into Reef Container stored in the yard. The port will also do refrigeration before the cargo is packed.
In-Yard Operation module
The following activities are carried out as of the port terminalâ„¢s services inside yard location.
The forwarding agent may request the port terminal to pack their cargo into the empty container, which is stacked inside the Yard. The port terminal will pack all the cargo into specified container and convert this into export. The forwarding agent may request the port terminal to unpack their cargo, which is imported from the port voyage. The port will unpack all the cargo and may also stack the empty container into the stack based on the request.
In-Yard Movement
All the containers inside the yard are handled by private carriers. The necessary data to move the container by the carrier are communicated through wire less system called RDT (Radio Data Transfer). Container discharged from the Vessel or loaded into the Vessel is also communicated through wire less system. All the carriers are equipped with VMT (Vehicle Mounted Terminal) to handle the data. All discharge and loading operation are communicated through HHT (Hand Handled Terminal). The CTMS application will communicate with RDT system to receive and send data based the VMT / HHT request.
Yard Planning
The location for stack import / export / import container are planned prior to container arrival. The yard planning is handled in the CTMS system.

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: it manager container terminal, container management system project, terminal management system project, container terminal management project report, empty conatiner deport operation ppt, index for container management project, container yard project report,
Popular Searches: container refrigeration ppt, seminar on mobile sms system of terminal mode, seminar on the terminal in networking, ivrs clinical research, project mba topic related to cfs and container, terminal management system project, cold storage containers,

Quick Reply
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  ONLINE EL-CHICO RESTAURANT MANAGEMENT SYSTEM seminar flower 1 595 08-04-2016, 11:10 AM
Last Post: mkaasees
  PROJECT ON HOSPITAL MANAGEMENT SYSTEM seminar flower 1 902 01-04-2016, 11:54 AM
Last Post: mkaasees
  ABSTRACT ON REPORT HOSPITAL MANAGEMENT SYSTEM study tips 1 554 01-04-2016, 11:53 AM
Last Post: mkaasees
  HOSTEL MANAGEMENT SYSTEM pdf seminar tips 3 7,563 09-12-2014, 03:42 PM
Last Post: mkaasees
  scholarship MANAGEMENT SYSTEM seminar tips 6 5,064 12-08-2014, 07:56 AM
Last Post: donsilver
  Color Lab Management System seminar ideas 9 5,283 11-06-2014, 10:04 AM
Last Post: seminar project topic
  Project Ideas- Hostel Management System Using Oracle mvaravinda 0 2,059 29-10-2013, 05:34 PM
Last Post: mvaravinda
  Project Ideas- Hostel Management System mvaravinda 0 863 29-10-2013, 05:30 PM
Last Post: mvaravinda
Wink Jewellery Management System mvaravinda 0 803 29-10-2013, 05:27 PM
Last Post: mvaravinda
  Web Based Blood Bank Management System project report maker 5 9,624 03-10-2013, 01:22 AM
Last Post: Guest