mechanical engineering project and implimentation
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Active In SP

Posts: 1
Joined: Jan 2011
31-01-2011, 09:54 PM

hi this is harshil, n i want information about the topic IMPROVEMENT IN TOOL LIFE OF MILLING CUTTER BY APPLICATION OF CRYOTREATMENT
seminar surveyer
Active In SP

Posts: 3,541
Joined: Sep 2010
01-02-2011, 12:13 PM


The term Cryogenic is derived from the Greek word ‘Cryo’ which means ice, cold or frost ‘genics’ means born. Cryogenic deals with production & utilization of low temperature below 0oc. The oxygen was firstly liquified in 1877 by coilletet & pietet in USA. The research work is also start at that time.
Cryogenic is of great importance in our day to day life applications and also is specialized applications.
Space research, it is used as a fuels in rocket, commercial application, Cryobilogy, Cryosurgery, in computers and industries.
Cryogenic treatment is very benifited as computer to conventional heat treatment. In conventional heat treatment austenite is converted into martensite. The conversation percentage of martensite on range of 30% to 50%. The retained austenite forms cracks in metal which reduce tool life. But when we Cryotreat the tool below 0oc using liquid Nitrogen. The austenite completely converted into martensite and martensite is hard so tool life is increased.
Actual Cryogenic treatment on tools can be done by two methods
1. Shallow Cryogenic process
Cooling at –120oc by means of dry ice or ultra cold nitrogen.
2. Deep Cryogenic process
Deep Cryogenic process means cooling at -196oc by liquid nitrogen.
After Cryotreatment mechanical properties are improved like strength, fatigue strength, impact strength, hardness and wear properties and thermal conductivity with tool life and when we perform actual Cryogenic treatment on tool the life of tool increased by 44%.


Active In SP

Posts: 10
Joined: Jan 2011
01-02-2011, 03:40 PM

Mechanical Project Engineer required by a national building services contractor to undertake the delivery of a £4m HVAC package on new hotel development in Central London. Working within a site based M&E project and implimentation team you will report in the Senior Project Manager and will be required to ensure the smooth running of the HVAC engineering package through design development, installation, commissioning to hand over and will be expected to perform duties to include the following:

- Management of site based team to ensure timely installation of HVAC services,
- Development of the HVAC design to ensure installation achieves clients specification,
- Resolve on site HVAC engineering issues,
- Assist the project and implimentation manager and QS in cost control during the contract,
- Assist in the procurement and co-ordination of materials and sub-contractors to ensure work is completed on time and to specification,
- Ensure H&S guidelines are adhered to by sub-contractors,
- Manage the commissioning process through to hand-over,
- Assist in the production of O&M manuals,
- Attend relevant design and site meetings,
Thinking To Register

18-01-2014, 01:05 PM

Sir, i want to do the project on preheating system is to increase the efficiency of the system....please suggest me

Important Note..!

If you are not satisfied with above reply ,..Please


So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: cryotreatment**titude platf, 14 cryosurgery,

Quick Reply
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
Last Post: Guest
  sppining mill project and implimentation Guest 0 616 06-11-2013, 01:09 PM
Last Post: Guest
  Detail of project and implimentation abstract Guest 1 540 23-08-2013, 09:46 AM
Last Post: study tips
  project and implimentation rajali 1 563 07-08-2013, 09:44 AM
Last Post: study tips
  topics for mechanical engineering project and implimentations for final year students aaaakki 13 14,223 30-07-2013, 03:32 PM
Last Post: Guest
Wink eclipse project and implimentation kktr317 1 810 27-06-2013, 01:10 PM
Last Post: study tips
  dream home project and implimentation crecent123 1 510 29-05-2013, 09:12 AM
Last Post: study tips
  project and implimentation ppt on 8051 micro controller based gsm controlled robotic arm shivaraj71 1 909 15-05-2013, 09:30 AM
Last Post: study tips
  electronics project and implimentation on electroencephelography Guest 0 560 29-04-2013, 03:37 PM
Last Post: Guest
  project and implimentation report on address book manishagulati 3 3,733 22-04-2013, 09:11 AM
Last Post: Guest